Slurry Line Calculation
Find the lowest velocity without settling
- Solids content (%)
- Particle size
- Flow rate
Result: Critical velocity, recommended size and pressure loss.
Home / Calculators / Mining
Calculations for abrasive fluids and long HDPE lines. 5 calculators.
Choose your sector“Ready” calculators can be used right away. For those marked “Coming soon”, send us the calculation on WhatsApp and our team will do it.
Find the lowest velocity without settling
Result: Critical velocity, recommended size and pressure loss.
How many mm of extra wall thickness are needed?
Result: Recommended wear allowance and wall thickness.
Size the line that pumps out mine water
Result: Pipe size, pump head, PN class.
Materials for long HDPE lines
Result: List of pipes, flange adaptors, flanges and bolts.
Line PN class from the shaft depth
Result: Pressure by stage and flange PN class.
Send us the list from the calculator; we will quote flanges, elbows, tees, reducers, pipes and valves in a single offer, with EN 10204 3.1 material certificates.
Results are for preliminary selection and do not replace engineering design. Ask our technical team for the final selection.