Net Head and Plant Output

How many MW after losses? Net head and installed capacity (MW).

Calculating…
Yazıcı Endüstri · yaziciendustri.com.tr

How do we calculate?

Net head = gross head − penstock friction loss (Darcy-Weisbach) − local losses. Power P = 9.81 × Q × Hnet × ηturbine × ηgenerator (kW). Annual energy = power × 8760 hours × capacity factor.

Let us turn your calculation into a bill of materials

Send us the list from the calculator; we will quote flanges, elbows, tees, reducers, pipes and valves in a single offer, with EN 10204 3.1 material certificates.

This calculator is used in these sectors: Hydropower. All calculators →

Results are for preliminary selection and do not replace engineering design. Ask our technical team for the final selection.